Value Delivered
EMCOR Construction Services Midwest performed HVAC, controls, and security systems updates and installations at multiple facilities for Wabash City Schools. Total annual energy savings for this three-phase project is projected to be $713,245 for 10 years, totaling $7,132,450.
Client Objectives
Wabash City Schools needed to upgrade the HVAC system, temperature controls, and security in their high school and middle school, as well as temperature controls and security at their middle school. The goal was to improve energy efficiency and reduce costs.
Solutions
Organized by phase and building, our work included:
Phase 1:
- Wabash High School
- Four-pipe heating and cooling piping distribution system
- Administrative office HVAC upgrade
- Hot water coil installation for gymnasium air handling unit
- Gymnasium exhaust fan power
- Science room rooftop unit replacement
- Library ventilator installation
- Chiller pad installation
- Boiler burner replacement
- Boiler and hot water piping insulation
- Through-wall flashing
- Outside air intake infilling
- Front entry door replacement
Phase 2:
- Wabash High School
- Classroom unit ventilator replacement
- Chiller installation
- HVAC system upgrades for library, music room, industrial arts room, and entire lower level
Phase 3:
- Wabash Middle School
- Split system replacements for kitchen/cafeteria and office
- Motor control center and pump Replacement
- Variable frequency drive additions
- Freezer evaporator and condensing unit replacement
- Fire detection system upgrade
- Direct digital controls upgrade
- OJ Neighbors Elementary School
- Direct digital controls upgrade
- Chiller replacement
- Fire detection system upgrade
- Intercom system upgrade
Client Background
Located in the Wabash, IN, Wabash City Schools has a current enrollment of roughly 1,415 students.