Hendricks County, IN

Brownsburg Community School Corporation

Contractor

EMCOR Construction Services Midwest

Client

Brownsburg Community School Corporation

Services Provided

  • Controls
  • HVAC
  • Boiler and chiller 
  • Performance testing 
Exterior view of Brownsburg Community School building

Value Delivered

EMCOR Construction Services Midwest provided HVAC and controls system upgrades and modifications to help improve energy efficiency at facilities across Brownsburg Community School Corporation (BCSC). With our efficiency measures and energy saving designs, BCSC is projected to realize over $288,000 in annual energy savings.

Client Objectives

In an effort to significantly improve energy conservation, BCSC set out to make a number of mechanical renovations throughout their school district. They wanted to upgrade controls, make boiler modifications, add demand control ventilation, and in general optimize the performance of their HVAC systems. 

Solutions

Our scope of work included:

  • District-wide cyber station upgrade 
  • Installation of heat recovery chiller and pony boilers 
  • Addition of peak demand load sheds
  • Addition of air handling unit variable frequency drives 
  • Review of all existing flow valves 
  • Replacement of existing C02 censors 
  • Functional performance testing of all existing HVAC systems 
  • Modifications and retrofits for blower coil unit 

Client Background

With a network of 12 education facilities, Brownsburg Community School Corporation serves over 7,000 students in Hendricks County, IN.