Monroe, IN

Metropolitan School District of Washington Township

Contractor

EMCOR Construction Services Midwest

Client

Metropolitan School District of Washington Township

Services Provided

  • Building Automation
  • Construction Services
Exterior view of North Central High School

Value Delivered

EMCOR Construction Services Midwest provided this client’s North Central High School with a new  building automation control network (BACnet).

We performed the work under a guaranteed energy savings contract which guaranteed a 10-year total of $418,511 in energy and operational cost savings. These savings were enough to cover all project costs in slightly over three and a half years.

The new automation system’s utility-grade capabilities now enable the district to meter, monitor, and control the school’s energy consumption and costs far more precisely than was possible with their previous campus-wide metering system.

Our solution helps improve the school’s indoor air quality, enhance building comfort, and increase system reliability—while providing ongoing economies, efficiencies, and investment returns.

Client Objectives

The client wanted to improve energy efficiency, air quality, building comfort, and HVAC reliability in an 800,000-square-foot high school.

Solutions

Our energy specialists planned and installed a state-of-the-art BACnet facility management system with improved control algorithms for all air-handling units, variable air volume boxes, boilers, and chillers.

Once the new controls were installed, we completely recommissioned the building to optimize performance.

Client Background

The Metropolitan School District of Washington Township serves approximately 10,000 students in 15 schools.