Value Delivered
EMCOR Construction Services Midwest upgraded mechanical, filtration, and draining systems for the pool at Lake Ridge Schools Corporation’s Calumet High School. The district is projected to receive annual savings of $238,063 for 10 years, totaling $2,380,630.
Client Objectives
Lake Ridge Schools needed to upgrade the existing pool system in their high school, which had not been working properly for several years.
Solutions
Our scope of work included upgrades for the following:
- Pool filtration system
- Natatorium HVAC system
- Pool heater system
- Lift station controller
- Main pool drain replacement
- Lighting contractor panel and switch upgrade for natatorium
Client Background
Lake Ridge Schools serves just under 2,000 students within the unincorporated sections of the Calumet Township and portions of Gary, IN.