Value Delivered
EMCOR Construction Services Midwest provided mechanical system upgrades, equipment replacements, and other improvements across the Triton School Corporation.
The large, multi-phase project will transform the school district’s infrastructure promoting the energy efficiency of their buildings and helping generate savings of $11,916,915 over 15 years.
Client Objectives
Triton School Corporation wanted to upgrade HVAC systems and other equipment at three locations in the district: their junior-senior high school, elementary school, and bus barn. They determined that a staggered approach, dividing the work into three separate projects, would be the ideal schedule.
Solutions
Organized by phase and building, our work included:
Project 1
- Triton Junior-Senior High School
- HVAC replacements for classrooms, industrial arts room, and wrestling room
- Gym lighting upgrade
- Gym locker room exhaust
- HVAC system upgrade for gymnasium
- Temperature control upgrade
- Cooler/freezer alarms
- Restroom upgrades
- Triton Elementary School
- Domestic water heater replacement
- Gym lighting upgrade
- Cooler/freezer alarms
- Cabinet unit heater and radiation actuator replacement
Project 2
- Triton Junior-Senior High School
- HVAC replacements for cafeteria, auditorium, and music room
- Chiller replacement
- Domestic water heater replacement
- Fire detection upgrade
- Emergency lights and exit signs
- Window replacements, including courtyard window wall
- Triton Elementary School
- Boiler burner fuel/air ratio controls
- Variable air volume box upgrade
- Energy management system upgrade
- Direct digital control system recommissioning
- Fire detection upgrade
- Triton Bus Barn
- Ventilation system
Project 3
- Triton Junior-Senior High School
- Boiler and hot water replacement
- Sump pump replacement
Client Background
Located in Bourbon, IN, Triton School Corporation is a class 1A school district with 1,000 students in grades K-12.