Greentown, IN
ECS provided design-build services to upgrade and add new facilities to support extracurricular activities.
Our HVAC, air curtains, lighting, and exhaust solutions delivered significant ongoing energy savings in three schools within Adams Central.
We replaced an air handling unit and condensing unit, added direct digital controls, installed variable frequency drives, and more to help improve efficiency at this school.
Systems designed and installed include mechanical, electrical, plumbing, low voltage, fire protection, and temperature controls.
Our mechanical and building automation systems helped a middle school meet precise temperature, humidity, lighting, and noise level requirements while saving on energy costs.
Our mechanical, electrical, plumbing, and controls solutions helped a middle school natatorium maintain regulatory compliance while saving more than $300,000 over 10 years in operational and energy costs.
We completed a building-wide energy management system upgrade, featuring high efficiency HVAC equipment, cutting-edge controls, custom-fabricated ductwork, and new electrical distribution.
This district-wide energy efficiency improvement project included controls upgrades, boiler modifications, the addition of demand control ventilation, and more.
As part of a number of mechanical and electrical improvements, we installed a new, cutting-edge geothermal central plant for two elementary schools.
We provided a state-of-the-art central HVAC plant for this new high school building and also helped demolish the old facility.
We upgraded a 25-year-old HVAC and building automation equipment at two separate buildings in order to help improve efficiency across this school district.
Installing a entirely new system and more energy-efficient lighting provided a K-12 school with a self-funding upgrade that paid for itself in energy savings.
We upgraded HVAC, lighting, and energy management systems within three schools, significantly reducing their operating and energy consumption costs.
To help reduce energy consumption and operating costs long-term within a 67,000-square-foot school building, we completely upgraded the building’s HVAC and lighting systems.
To upgrade a community high school and elementary school, we installed new HVAC systems, roofing, lighting, and windows; and repaired exterior walls and parking lots.
To help six schools achieve ongoing savings and efficiencies, we installed new HVAC systems, generators, lighting, windows, and more.
We retrofitted lighting systems, and installed air conditioning and automated control solutions, to help a large public school system save an average of $320,000 in energy costs annually.
For this multi-phase renovation project, we provided HVAC, lighting, electrical, and infrastructure improvements for two school buildings.
We installed energy-saving solutions in three schools to help a school corporation achieve a 17 percent reduction in energy consumption, improve building comfort, and lower operating costs.
At six buildings across this school district, we provided a range of mechanical, electrical, and infrastructure improvements focused on saving energy.
We converted this client from an outdated electric heating system to a new natural gas-fired system and made a number of other HVAC improvements across their school district all in an effort to improve energy efficiency.
We provided a state-of-the-art central HVAC plant for this new high school building and also helped demolish the old facility.
We performed HVAC, lighting, controls, and other facility improvements that will help this district’s high school and elementary school buildings improve efficiency.
We installed a new boiler system and controls which helped the client save $134,720 in operational, energy, and maintenance expenses over 10 years.
Our energy-efficient solutions throughout a 75,000-square-foot elementary school helped to reduce operating costs while significantly improving the learning environment.
When their elementary building was suffering from inefficient energy use, this school district turned to us for a new building automation system and recommissioning.
We replaced an outdated steam heating system with a cutting-edge HVAC system and new controls in an effort to promote energy efficiency at this high school.
We repaved and expanded the parking lot, upgraded lighting, added a new electrical sign, and made other improvements to the exterior of this school building.
We upgraded the filtration, heating, and draining equipment for this high school’s pool, as well as providing additional HVAC and lighting improvements.
We installed multizone units and an energy management system to help save more than $330,000 in annual energy costs within eight years.
We helped this school district improve efficiency by upgrading mechanical systems at its high school, intermediate school, and elementary school.
We provided a high school with a new building automation system that delivered energy savings substantial enough to cover all project costs in less than four years.
Across four buildings at this school district, we provided a complete recommissioning analysis to identify efficiency improvements, followed by a wide range of mechanical, controls, and lighting upgrades.
At two school buildings, we provided HVAC upgrades, boiler replacements, and controls improvements that have helped this school district achieve ongoing savings.
Our team worked off hours to replace existing light bulbs with energy efficient bulbs.
For two schools, we helped improve HVAC reliability, lighting efficiency, and indoor air quality, while saving them more than $1.8 million in energy costs over 10 years.
Our comprehensive mechanical, electrical, and energy management solutions helped save a total of $660,308 in energy costs within eight years.
We helped modernize this elementary school and improve efficiency by upgrading its HVAC systems and windows.
To help improve security across nine community schools, we installed a state-of-the-art digital system that allowed viewing and operating of all nine facilities’ cameras from a central workstation.
During this end-to-end remodel of an elementary school, we performed upgrades for mechanical equipment, controls, plumbing, electrical systems, and more.
We provided extensive upgrade services across nine different facilities for this school district, all aimed at improving their energy efficiency.
Our mechanical and HVAC upgrade services will help this school building significantly improve efficiency and lower energy costs.
We provided HVAC installation and upgrade services, as well as a complete overhaul of this school’s building automation systems.
To help reduce operational costs for a 143,000-square-foot school building, we replaced the multi-zone electric air conditioning system with a more efficient multi-zone natural gas-fired system.
For three elementary schools, we helped improve indoor air quality, restore a historic gymnasium, integrate building controls, and guarantee energy savings of more than $498,000 in 10 years.
We provided an array of remodeling and infrastructure improvements aimed at helping this high school achieve energy savings.
Restroom remodels and HVAC upgrades will help this school building save money in the long term.
We helped a school system reduce operational, energy consumption, and maintenance costs by repairing a leaky roof, replacing inefficient lighting, and installing a new turf sports field.
This 21,500 square foot community center, comprised of a pre-engineered steel building, provides much needed space for local community and sports events.
To help three schools in one building resolve issues caused by separate heating, cooling, and ventilation, we provided a system that incorporates the latest energy-efficiency solutions.
We provided high-efficiency HVAC and lighting upgrades that helped a school realize more than $260,000 in energy savings in less than seven years.
Over the course of three projects, we completely overhauled the mechanical and HVAC infrastructure at three facilities at this school district.
Temperature controls, infrastructure, and HVAC improvements were provided at three locations to help this school district improve efficiency.
For this three-phase project, we provided HVAC, controls, and security systems improvements at three different school buildings.
Our mechanical and lighting upgrades featured a new high efficiency boiler, as well as state-of-the-art controls, energy management, and building automation systems.