K-12

Adams Central Community Schools

Our HVAC, air curtains, lighting, and exhaust solutions delivered significant ongoing energy savings in three schools within Adams Central.

View Case Study

Batesville Primary School

We replaced an air handling unit and condensing unit, added direct digital controls, installed variable frequency drives, and more to help improve efficiency at this school.

View Case Study

Blackford County Schools Expansion and Renovation

Systems designed and installed include mechanical, electrical, plumbing, low voltage, fire protection, and temperature controls.

View Case Study

Bluffton-Harrison Middle School Mechanical and BAS

Our mechanical and building automation systems helped a middle school meet precise temperature, humidity, lighting, and noise level requirements while saving on energy costs.

View Case Study

Bluffton-Harrison Middle School Natatorium 

Our mechanical, electrical, plumbing, and controls solutions helped a middle school natatorium maintain regulatory compliance while saving more than $300,000 over 10 years in operational and energy costs.

View Case Study

Bridgepoint Elementary

We completed a building-wide energy management system upgrade, featuring high efficiency HVAC equipment, cutting-edge controls, custom-fabricated ductwork, and new electrical distribution.

View Case Study

Brownsburg Community School Corporation

This district-wide energy efficiency improvement project included controls upgrades, boiler modifications, the addition of demand control ventilation, and more.

View Case Study

Central Noble Community Schools – Elementary Schools

As part of a number of mechanical and electrical improvements, we installed a new, cutting-edge geothermal central plant for two elementary schools.

View Case Study

Central Noble Community Schools – High School

We provided a state-of-the-art central HVAC plant for this new high school building and also helped demolish the old facility.

View Case Study

Central Noble Community Schools – Multi-Location

We upgraded a 25-year-old HVAC and building automation equipment at two separate buildings in order to help improve efficiency across this school district.

View Case Study

Christ the King Catholic School

Installing a entirely new system and more energy-efficient lighting provided a K-12 school with a self-funding upgrade that paid for itself in energy savings.

View Case Study

Cloverdale Community School Corporation

We upgraded HVAC, lighting, and energy management systems within three schools, significantly reducing their operating and energy consumption costs.

View Case Study

Cowan Community School Corporation

To help reduce energy consumption and operating costs long-term within a 67,000-square-foot school building, we completely upgraded the building’s HVAC and lighting systems.

View Case Study

Danville Community School Corporation

To upgrade a community high school and elementary school, we installed new HVAC systems, roofing, lighting, and windows; and repaired exterior walls and parking lots.

View Case Study

Duneland School Corporation

To help six schools achieve ongoing savings and efficiencies, we installed new HVAC systems, generators, lighting, windows, and more.

View Case Study

East Allen County School Corporation

We retrofitted lighting systems, and installed air conditioning and automated control solutions, to help a large public school system save an average of $320,000 in energy costs annually.

View Case Study

Eastern Howard School Corporation

For this multi-phase renovation project, we provided HVAC, lighting, electrical, and infrastructure improvements for two school buildings.

View Case Study

Flat Rock-Hawcreek School Corporation

We installed energy-saving solutions in three schools to help a school corporation achieve a 17 percent reduction in energy consumption, improve building comfort, and lower operating costs.

View Case Study

Fremont Community Schools - Infrastructure Upgrades

At six buildings across this school district, we provided a range of mechanical, electrical, and infrastructure improvements focused on saving energy.

View Case Study

Fremont Community Schools - Solar Farm

We converted this client from an outdated electric heating system to a new natural gas-fired system and made a number of other HVAC improvements across their school district all in an effort to improve energy efficiency.

View Case Study

Garrett-Keyser-Butler Community School District – High School

We provided a state-of-the-art central HVAC plant for this new high school building and also helped demolish the old facility.

View Case Study

Garrett-Keyser-Butler Community School District – Multi-Location

We performed HVAC, lighting, controls, and other facility improvements that will help this district’s high school and elementary school buildings improve efficiency.

View Case Study

Garret-Keyser-Butler Community School District’s J.E. Ober Elementary School Boilers

We installed a new boiler system and controls which helped the client save $134,720 in operational, energy, and maintenance expenses over 10 years.

View Case Study

Garret-Keyser-Butler Community School District’s J.E. Ober Elementary School HVAC

Our energy-efficient solutions throughout a 75,000-square-foot elementary school helped to reduce operating costs while significantly improving the learning environment.

View Case Study

Greensburg Elementary

When their elementary building was suffering from inefficient energy use, this school district turned to us for a new building automation system and recommissioning.

View Case Study

Greensburg Junior-Senior High School

We replaced an outdated steam heating system with a cutting-edge HVAC system and new controls in an effort to promote energy efficiency at this high school.

View Case Study

Lake Ridge Schools – Longfellow Elementary

We repaved and expanded the parking lot, upgraded lighting, added a new electrical sign, and made other improvements to the exterior of this school building.

View Case Study

Lake Ridge Schools – Pool System

We upgraded the filtration, heating, and draining equipment for this high school’s pool, as well as providing additional HVAC and lighting improvements.

View Case Study

Manchester Community Schools - Energy Solutions

We installed multizone units and an energy management system to help save more than $330,000 in annual energy costs within eight years.

View Case Study

Manchester Community Schools - Mechanical Systems

We helped this school district improve efficiency by upgrading mechanical systems at its high school, intermediate school, and elementary school.

View Case Study

Metropolitan School District of Washington Township

We provided a high school with a new building automation system that delivered energy savings substantial enough to cover all project costs in less than four years.

View Case Study

Mill Creek Community School Corporation (MCCSC)

Across four buildings at this school district, we provided a complete recommissioning analysis to identify efficiency improvements, followed by a wide range of mechanical, controls, and lighting upgrades.

View Case Study

Monroe Central School Corporation

At two school buildings, we provided HVAC upgrades, boiler replacements, and controls improvements that have helped this school district achieve ongoing savings.

View Case Study

Mount Vernon High School Lighting Retrofit

Our team worked off hours to replace existing light bulbs with energy efficient bulbs.

View Case Study

North Daviess Community Schools Corporation

For two schools, we helped improve HVAC reliability, lighting efficiency, and indoor air quality, while saving them more than $1.8 million in energy costs over 10 years.

View Case Study

North Newton School Corporation

Our comprehensive mechanical, electrical, and energy management solutions helped save a total of $660,308 in energy costs within eight years.

View Case Study

Parkwood Elementary School

We helped modernize this elementary school and improve efficiency by upgrading its HVAC systems and windows.

View Case Study

Plymouth Community School Corporation

To help improve security across nine community schools, we installed a state-of-the-art digital system that allowed viewing and operating of all nine facilities’ cameras from a central workstation.

View Case Study

Porter Township School Corporation

During this end-to-end remodel of an elementary school, we performed upgrades for mechanical equipment, controls, plumbing, electrical systems, and more.

View Case Study

School City of Mishawaka

We provided extensive upgrade services across nine different facilities for this school district, all aimed at improving their energy efficiency.

View Case Study

Shelbyville Central Middle School

Our mechanical and HVAC upgrade services will help this school building significantly improve efficiency and lower energy costs.

View Case Study

Simatovich Elementary School

We provided HVAC installation and upgrade services, as well as a complete overhaul of this school’s building automation systems.

View Case Study

South Central Community School Corporation

To help reduce operational costs for a 143,000-square-foot school building, we replaced the multi-zone electric air conditioning system with a more efficient multi-zone natural gas-fired system.

View Case Study

South Dearborn Community School Corporation

For three elementary schools, we helped improve indoor air quality, restore a historic gymnasium, integrate building controls, and guarantee energy savings of more than $498,000 in 10 years.

View Case Study

Southeast Fountain Community School Corporation

We provided an array of remodeling and infrastructure improvements aimed at helping this high school achieve energy savings.

View Case Study

Southeast Fountain Elementary School

Restroom remodels and HVAC upgrades will help this school building save money in the long term.

View Case Study

Taylor Community School Corporation

We helped a school system reduce operational, energy consumption, and maintenance costs by repairing a leaky roof, replacing inefficient lighting, and installing a new turf sports field.

View Case Study

Taylor Community School Corporation - Community Activities Center

This 21,500 square foot community center, comprised of a pre-engineered steel building, provides much needed space for local community and sports events.

View Case Study

Tri-Central Community Schools

To help three schools in one building resolve issues caused by separate heating, cooling, and ventilation, we provided a system that incorporates the latest energy-efficiency solutions.

View Case Study

Triton School Corporation - HVAC and Lighting Systems

We provided high-efficiency HVAC and lighting upgrades that helped a school realize more than $260,000 in energy savings in less than seven years.

View Case Study

Triton School Corporation - Mechanical System Upgrades

Over the course of three projects, we completely overhauled the mechanical and HVAC infrastructure at three facilities at this school district.

View Case Study

Union Township School Corporation

Temperature controls, infrastructure, and HVAC improvements were provided at three locations to help this school district improve efficiency.

View Case Study

Wabash City Schools

For this three-phase project, we provided HVAC, controls, and security systems improvements at three different school buildings.

View Case Study

Wapahani High School

Our mechanical and lighting upgrades featured a new high efficiency boiler, as well as state-of-the-art controls, energy management, and building automation systems.

View Case Study